In two years or less, we wanted to have no IT infrastructure on premise. Getting to this state involved a three-phased approach and illustrates my heart surgery metaphor. We’re going to do the equivalent of a heart transplant on our servers. Obviously, there’s some risk involved with this, but at the same time, in order for the patient to get better, we have no choice. The first phase of our approach was stabilization. Stabilization entailed doing good IT hygiene: getting a good sense of what we have and instilling good IT discipline. Once we stabilized, the next phase was rationalization. Prior to this phase, we rolled out a web-based e-mail system hosted off site. We did it in less than two months, which was a rather accelerated clip, but that was important because if we were going to get ready for rationalization–moving servers off site– then we needed to at least have the e-mail system in place before pulling the plug. We really were doing “open heart surgery” because we literally powered everything off at the FCC that could not be moved to the cloud right away. We put that infrastructure containing 400 terabytes of data on seven different trucks destined for an off-site facility. The rational- ization phase and the server lift provided us with a complete inventory of IT materials accumulated over the last 20 years.